Wind now Wind See the full forecast
Patrik International

PATRIK ALU S-CURVE BOOM

3 009 kr incl. VAT

OVERVIEW

Light, durable and affordable boom made as a one-piece monocoque aluminium construction.

  • Super-smooth EVA grip to give you the longest sessions without blisters on your hands.
  • 27mm round diameter for a direct but relaxed and less tiring hold.
  • New harness line position indicator system for easy memory and quick adjustments.
  • 38cm width S-Curve for the most direct connection to wave and freestyle sails.
  • Optimised weight-to-strength ratio due to strong monocoque aluminium.
  • Double-Pin Clips for superior strength and backend stiffness.
  • Printed cm-scale on the backend for convenient adjustment of the boom.
  • Outhaul rope loop feature for quick and easy rigging.
  • Detachable click-in RDM adapter.


If you don't want to compromise on performance and quality the search for your new boom is over with the new PATRIK ALU S-Curve Boom.

BOOM FINDER

Choose your boom curve first as the curve and outline of a boom are so much more important than you think.
The narrow and new-school S-Curve gives you a direct feeling and most control for wave sails and any small freeride and freestyle sails. 
When the sails get bigger a wider M-Curve is needed as being too close to the sail will reduce control and power transfer and simply feel weird. 
Sailing powered up on wider boards requires an outside and down body position while keeping the sail upright with the even wider L-Curve.
The XL-Curve gives you a comfortable sailing position on wider boards and the best control in foiling and slalom racing.
Our Micro Boom on the other hand is purely adapted to the needs and ergonomics of kids and the smallest and lightest riders out there.

Of course your boom length needs to match your sail sizes, but the boom outline is what makes the real difference on the water.
So... shhhht - Don't tell anyone if you wanna be faster than your friends!

Choose our monocoque carbon booms for maximum stiffness and ultimate performance.
Advanced and powerful riders will benefit from the improved performance of carbon over aluminium the most.
Smaller and lighter riders will simply love our carbon booms because they are lightweight and thin.

Our aluminum booms offer the best price-performance ratio and are the first choice for surf schools, beginners, intermediates and lighter riders.

Shipping (Sweden) 499 kr

Fråga en surfare

Osäker på storlek eller vilken utrustning som passar dig? Ring eller kom förbi butiken i Kungsbacka.

Shape & construction

Monocoque aluminum construction, manufactured in one piece, 38 cm S-Curve width.

Usage

FIND THE RIGHT BOOM – BOOM GUIDE Choose the right boom curve first – the curve and shape of a boom are more important than you might think. The narrow S-Curve provides direct feel and the best control for wave sails, as well as smaller freeride and freestyle sails. As the sails get larger, a wider M-, L- or XL-Curve is required. Our aluminum booms offer the best value for money and are the first choice for surf schools, beginners, as well as intermediate and light-wind windsurfers.

Reviews

No reviews yet — be the first to review.