Superlight and stiff maneuver and wave-oriented carbon boom handmade as a one-piece monocoque carbon construction.
If you don't want to compromise on performance and quality, the search for your new boom is over with the new PATRIK Carbon S-Curve Boom.
Choose your boom curve first as the curve and outline of a boom are so much more important than you think.
The narrow and new-school S-Curve gives you a direct feeling and most control for wave sails and any small freeride and freestyle sails.
When the sails get bigger, a wider M-Curve is needed as being too close to the sail will reduce control and power transfer and simply feel weird.
Sailing powered up on wider boards requires an outside and down body position while keeping the sail upright with the even wider L-Curve.
The XL-Curve gives you a comfortable sailing position on wider boards and the best control in foiling and slalom racing.
Our Micro Boom on the other hand is purely adapted to the needs and ergonomics of kids and the smallest and lightest riders out there.
Of course, your boom length needs to match your sail sizes, but the boom outline is what makes the real difference on the water.
So... shhhht - Don't tell anyone if you wanna be faster than your friends!
Choose our monocoque carbon booms for maximum stiffness and ultimate performance.
Advanced and powerful riders will benefit from the improved performance of carbon over aluminum the most.
Smaller and lighter riders will simply love our carbon booms because they are lightweight and thin.
Our aluminum booms offer the best price-performance ratio and are the first choice for surf schools, beginners, intermediates and lighter riders.
Fråga en surfare
Osäker på storlek eller vilken utrustning som passar dig? Ring eller kom förbi butiken i Kungsbacka.
You need an account with us to leave a review. Log in
No reviews yet — be the first to review.